top of page

PROJECTS

A Handful Of Some Of Our Ongoing And Past Projects
IMG_20200402_084328.jpg
CO-OP Store And New Housing Development
The New Forest

Setting out foundations, holding down bolts, houses, roads, drainage and as built surveys.

IMG_20200117_120503.jpg
Pool And Gym House
Hungerford

A very detailed and complicated concrete structure sunk into the ground. Our works include contiguous piling, reinforced concrete, capping beams, swimming pool, cedar wood printed concrete panels, radius concrete walls. All works had to be millimetre perfect.    

hsbc--london-winner-in-the-office-catego
HSBC 8 Canada Square
Canary Wharf London 

This was an enjoyable and different kind of project. We were asked to set out the concrete bases of 4 new large water tanks on the roof of the HSBC building in London. The bases had to coincide with the beams running underneath the roof. This took careful surveying of the beams and then taking that data we could set out where they were onto of the roof so as they could take the weight of the new tanks.

csm_Castle_Combe_01_-x450_f0359ac1ec.jpg
Solar Farm - Castle Combe Race Track
Wiltshire

Setting out of solar panel bases, inverters and service roads. We used GPS here to accurately mark out the solar panels so as to get the maximum daily light.

fbath.jpg
Crest Nicholson, Riverside Development
Bath

A faceted block of Bath stone apartments. We covered most of the apartment blocks on this site as well as the roads, drainage and landscaping features. 

IMG_20190508_0903355.jpg
Lovell Partnerships - MOD Housing Development  
Larkhill Wiltshire

Houses and roads project for the MOD. Nu-span floors were used here which required block work to be built to a high standard in level variation. As built floor level surveys were needed here.

IMG_20190328_0956360.jpg
David Lloyd Health Clubs
Bristol

Emersons Green area of Bristol. This site included 1 indoor and 1 outdoor swimming pool, tennis courts, holding down bolts, foundations, drainage, car parks.

bottom of page