SETTING OUT

Following the survey of a projects area architects and design engineers require their design and data to be converted into tangible detail on site

 

Setting out is the next step in any project before building work can commence.

 

Tribrach site engineers use the latest technology and Topcon equipment in combination with ordnance survey and national grid coordinates to achieve precise and reliable results on any construction or building site. We accurately mark out details on site using a combination of drawings, survey data and CAD models using pegs, pins or nails in the ground.

 

These are examples of what work we can carry out.

 

Brickwork Corners

Pile Positions

Foundations

Drainage

Grid Lines

Steel Columns / Holding Down Bolts / Resin Anchor

 

Roads / 278 Works

 

Datum Levels 

  •  

  •  

  •  

  •  